
Walk a hospital model with a hospital administrator and they will go straight to the ER ambulance bay — not the lobby. They are checking: is the ambulance drop-off separated from the main entrance? Can a stretcher roll from the helipad to the trauma unit without crossing outpatient traffic? Where does the infectious-disease entrance sit?
A hospital model that reads like an office park fails. The functional circulation — ER, outpatient, inpatient, infection control, service tunnel — has to be legible on the board.
表格
| Facility Type | Footprint |
|---|---|
| Community hospital | 2.5 m × 2 m – 4 m × 3 m |
| General hospital / medical campus | 4 m × 3 m – 7 m × 5 m |
| Medical city / hospital cluster | 7 m × 5 m – 12 m × 8 m |
1:300 ~ 1:500 — main range. Entries, drop-offs and tower masses read.
1:200 — for the ER and ICU wing as a separate cutaway inset, showing the internal department layout.
Community hospital: 20 ~ 30 working days
General hospital campus: 40 ~ 60 working days
Medical city: 80 ~ 110 working days
Standard (towers, ER bay, healing garden, parking structure, warm window lighting): USD 650 ~ 950 / m²
Premium (curtain-wall façade detail, helipad lighting, separate department entries, interactive floor-plan overlay, landscape healing garden): USD 1,100 ~ 1,600 / m²
A 5 m × 3.5 m general hospital at premium lands around USD 25,000 ~ 35,000.
The ER ambulance bay, main outpatient entrance, inpatient drop-off and service entry are four separate points on the board — color-coded and labeled.
The helipad on the roof is marked with the "H" and the flight approach direction.
A service tunnel / loading dock is shown on the service side, away from patient entrances.
The outpatient tower, inpatient tower, ICU building and admin block are visually distinct — not one long slab.
The façade rhythm (window bays per inpatient room) follows the actual floor plan.
The healing garden, rooftop garden and waiting courtyards are planted, not paved over.
The ambulance turning radius, staff parking, visitor drop-off and the connecting road to the city are all placed per the traffic study.
The infection-control separate entry is there even if it's a small door — infection-control reviewers will look for it.
Board, acrylic label plates for each department, lighting remote, one installation visit, two spare LED kits.