
Stadium models get argued about on one thing: can every seat see the pitch without a column bloc
| Venue Type | Footprint |
|---|---|
| Single stadium | 2.5 m × 2 m – 5 m × 3.5 m |
| Stadium + aquatics + arena cluster | 5 m × 3.5 m – 9 m × 6.5 m |
| Full Olympic park | 9 m × 6.5 m – 14 m × 10 m |
king? The seating bowl, the roof canopy overhang, the entrance concourses and the VIP boxes all have to read on the board. A stadium that looks like a flying-saucer with no interior detail doesn't survive the IOC / bidding review.
表格
1:500 ~ 1:800 — the bowl, roof and surrounding plaza read.
1:300 — for the main stadium as a hero piece with the seating bowl visible.
Single stadium: 30 ~ 45 working days
Venue cluster: 60 ~ 90 working days
Olympic park: 100 ~ 140 working days
Standard (stadium shell, seating bowl color, plaza, landscaping, warm night lighting): USD 850 ~ 1,200 / m²
Premium (roof canopy 3D-printed, pitch detail with field markings, VIP entrance, scoreboard, pedestrian bridge, night floodlight simulation): USD 1,300 ~ 1,900 / m²
A 7 m × 5 m venue cluster at premium lands around USD 55,000 ~ 75,000.
The seating bowl is visible through the roof opening — red seats, green pitch, white track, all scaled.
The roof canopy overhang is profiled to the actual design, not a flat disc.
VIP boxes, press box and the tunnel entrance are visible on the bowl rim.
The natatorium, indoor arena and warm-up hall sit around the main stadium per the master plan.
Athlete bridge, media entrance and VIP drop-off are three separate points.
The plaza, reflecting pools and connecting green spaces are landscaped.
Night scene: stadium floodlights on, pitch lit bright, concourse warm, plaza path lighting on.
The scoreboard face lights up on command.
Board, acrylic dust cover, remote with day/game-night scenes, one installation, a marketing photo set.