Planning-hall models run five or six metres, and the first failure usually happens before design: the finished piece will not fit through the door. A lift car is typically 1.6 × 1.5 m with a 1.1 m opening, so a six-metre platform never goes up in one piece. Splitting the board is the first decision, not the last.
表格
| Venue condition | Max piece size | How to split |
|---|---|---|
| Service lift, 1.1 m door | 2.4 × 1.2 m | Along road or plot boundaries |
| Passenger lift only | 1.5 × 1.0 m | Six to ten pieces, assembled on site |
| Ground floor, door opens | 3.0 × 1.5 m | Two pieces, craned in |
Cuts follow the road network, a river or the red line. Joints land on those lines and almost disappear. Cut through a block of buildings and the seam runs across the facades, and no amount of filler hides it.
表格
| Item | Spec |
|---|---|
| Scale | 1:1000 for districts, 1:500 for focus areas |
| Common sizes | 400×300 / 600×450 / 800×600 cm |
| Platform | Steel frame with high-density board, 8–12 cm thick |
| Buildings | Acrylic or ABS, colour-coded by use |
| Surface | Printed roads, epoxy water, flocked green |
At 1:1000 a 100 m tower becomes 10 cm, enough to read massing and density. At 1:500 the same tower is 20 cm and facades appear. Two scales in one hall is common; colour-code the districts.
High-density board, then plaster or epoxy for relief, contours in tonal steps. Do not overdo it: a planning model argues for accuracy, not drama.
Main, secondary and access roads in three line weights. Land use colour-coded — residential, commercial, industrial, green — with a legend panel.
Heights converted from planning indices, so high-plot-ratio land reads dense and tall. Parapets and plant rooms modelled; no plain boxes.
Road names, plot numbers and public facilities in relief or flat lettering, minimum 6 mm cap height, legible at one metre.
表格
| Size | Reference price (RMB) | Lead time |
|---|---|---|
| 400×300 cm, 1:1000 | 18,000–30,000 | 30–35 days |
| 600×450 cm, 1:1000, lit | 35,000–55,000 | 40–48 days |
| 800×600 cm, mixed scales | 60,000–90,000 | 50–60 days |
Public projects usually go to tender. We supply scheme drawings, a priced bill, material schedules and reference images for submission.
Pieces arrive, platform is levelled, joints are colour-matched, then buildings and planting. Six metres and up: two people, three days. We bring the tools; the site provides power and working space.