The question site crews ask most is not on the drawing: "how does this joint actually go together?" Prefabricated construction makes it worse — slabs, wall panels, grout sleeves and cast-in-situ strips are all buried. A cut-away model on the project table does more than ten toolbox talks.
表格
| Item | Spec |
|---|---|
| Scale | 1:50, or 1:20 for a single joint |
| Size | 60 × 40 cm for a full wall section |
| Content | Composite slab, precast panel, grout sleeve, connectors, insulation |
| Materials | Acrylic, ABS, metal connectors |
| Accessories | Component labels, sequence cards |
Grout sleeves between panels, bar embedment depth, grout port position. This is where quality control lives.
Cast layer thickness over the composite slab, truss bars, joint treatment — visible in one look.
Insulation, membrane and render in sequence, colour-coded per layer. The clearest way to teach the build-up.
Joint width, sealant position, water stop. Made removable so it can be lifted out and refitted during a briefing.
Layer thicknesses converted at 1:50, tolerance ±0.3 mm.
Bars and sleeves to actual 规格,not schematic rods.
Layers colour-coded with labels, no more than six colours.
Removable parts on magnets or clips, holding shape after repeated use.
Handle on the base for carrying between site and meeting room.
表格
| Configuration | Reference price (RMB) | Lead time |
|---|---|---|
| Single joint, 1:50 | 3,500–4,500 | 18–20 days |
| Full wall section with removable parts | 4,500–6,000 | 20–22 days |
| 1:20 enlarged joint with labelling system | 6,000–8,000 | 22–26 days |
Ten units or more for project teams: about 20% off, 25–30 days.