One sentence: if a hub model does not explain the transfer, it is just a building model. High-speed rail, metro, bus terminal and coach station stacked together — what a visitor wants to know is how long it takes to get from the platform to the metro gate.
表格
| Item | Spec |
|---|---|
| Scale | 1:400 with surroundings, 1:200 for the station alone |
| Size | 300 × 200 cm |
| Content | Station building, platforms, track, transfer passages, bus terminal |
| Materials | Acrylic station, ABS track, metal fittings |
| Lighting | Interior glow, route light strips |
Basement, ground and elevated levels as three removable layers. Lift them off one at a time and the complexity goes vertical, where it belongs. Skip the layering and you only have a shell.
A continuous strip from the rail exit to the metro gates, coloured to separate it from other flows. Follow the strip and the walking distance becomes obvious.
Platform length, track count and arrival-departure layout as built. Track is not a black line: ballast, sleepers and rail in three layers.
Bus bays, taxi holding area, car park, footbridge. The last mile is part of the hub; without it the model is incomplete.
Station facades set out from architectural drawings, mullions legible.
Track and platform dimensions converted from operating requirements, no dramatic licence.
Layers stable when stacked, 2–3 mm clearance between them.
Strip colour temperature consistent, direction matching reality.
Label plate per layer naming the level and its function.
表格
| Configuration | Reference price (RMB) | Lead time |
|---|---|---|
| Station alone, 1:200 | 15,000–22,000 | 30–35 days |
| Station with surroundings, 1:400 | 25,000–38,000 | 40–45 days |
| Three cut-away levels with path lighting | 38,000–55,000 | 45–55 days |