Nobody buys a public building, but people use it. At review meetings the judges ask two things: how students enter the campus, and whether an ambulance can reach the emergency department directly. So the priority here is circulation, not sales-office lighting.
表格
| Item | Spec |
|---|---|
| Scale | 1:200 for a cluster, 1:300 for a district |
| Size | 240 × 160 cm, school plus hospital |
| Content | Teaching blocks, labs, canteen, sports field, outpatient, inpatient, emergency |
| Materials | Acrylic buildings, ABS fittings, timber platform |
| Weight | Approx. 35–50 kg |
Campus gate, parent drop-off and garage entrance all marked. Paving colour separates pedestrian from vehicle routes, so the logic reads without explanation.
Turning space in front of the emergency entrance, ambulance ramp modelled rather than drawn as a line. Reviewers notice this.
Corridors between teaching blocks, internal routes from outpatient to inpatient. Modelled in translucent material, because these are the paths you cannot see.
Buildings set out from the master plan, floor counts and setbacks correct.
Running track with lane markings and turf texture, not flat colour.
Site paving differentiated by material: footway, carriageway, plaza.
Roof plant and lift rooms at their real positions.
Restrained palette — off-white and light grey; public buildings do not wear bright colours.
表格
| Configuration | Reference price (RMB) | Lead time |
|---|---|---|
| Standard, unlit | 12,000–18,000 | 28–32 days |
| Building and site lighting | 18,000–25,000 | 32–38 days |
| Removable roofs for interiors | 25,000–32,000 | 38–42 days |
Competition models can be expedited to 20 days at a 15% premium.