Data center models look boring from the outside — big white boxes in a field. But the people approving the investment are looking for three things on the board: the cooling efficiency loop (where does hot air go?), the power redundancy (where are the substations and backup generators?), and the security perimeter (how many gates, how much setback?).
If your model hides the cooling plant and shows only the pretty data hall, you've built marketing material, not a planning tool.
表格
| Campus Type | Footprint |
|---|---|
| Single data hall | 2 m × 1.5 m – 3.5 m × 2.5 m |
| Multi-hall campus | 3.5 m × 2.5 m – 6 m × 4.5 m |
| Hyperscale campus | 6 m × 4.5 m – 10 m × 7 m |
1:500 ~ 1:800 — the working range. Cooling towers, substations and truck bays read.
1:1,200 — for hyperscale where the site is hundreds of acres.
Single hall: 15 ~ 25 working days
Multi-hall campus: 35 ~ 50 working days
Hyperscale with interactive overlay: 60 ~ 90 working days
Standard (flat-roof data halls, cooling towers, substations, perimeter fence, cool blue lighting): USD 450 ~ 700 / m²
Premium (rooftop HVAC detail, generator farm, water storage, security gatehouse, PUE data overlay screen): USD 800 ~ 1,200 / m²
A 5 m × 3.5 m multi-hall campus at premium lands around USD 18,000 ~ 26,000.
Cooling towers, chillers and water storage tanks are placed on the upwind side per the mechanical drawing. The review team will trace the air path.
The coolant pipeline routing is shown as a colored overlay on the board edge.
Rooftop HVAC units are individual pieces, not a textured roof.
Main substation, backup diesel generator farm and UPS rooms are separate buildings on the board.
The high-voltage feed line and the redundant second feed are routed on the site plan.
Fuel storage tanks and the fire water tank are visible.
The perimeter fence, the manned gatehouse, the vehicle inspection bay and the man trap are modeled.
The loading dock for server delivery is on the secure side, away from public roads.
Board, cooling and power legend sheets, lighting remote, one installation. We can also wire an interactive PUE / uptime overlay screen if your AV vendor supplies the content.