A solar farm model is easy to get wrong. The default mistake is packing the PV rows too tight — visually dense, but physically impossible because the morning shadow from row N kills row N+1. Reviewers from the power institute will measure the row pitch against the tilt angle and the site latitude on your board. Get that wrong and the whole project looks amateur.
表格
| Project Type | Footprint |
|---|---|
| Rooftop PV demo | 1.5 m × 1 m – 2.5 m × 2 m |
| Ground-mounted solar farm | 3 m × 2 m – 7 m × 5 m |
| Solar + storage hybrid base | 5 m × 3.5 m – 10 m × 7 m |
1:1,000 ~ 1:2,000 — row spacing and access roads read.
1:500 — for the energy storage station detail, shown as an inset.
Rooftop demo: 10 ~ 15 working days
Ground farm: 20 ~ 35 working days
Solar + storage hybrid: 40 ~ 60 working days
Standard (PV panel rows, access roads, inverter stations, substation): USD 350 ~ 550 / m²
Premium (tilted PV racks with real panel texture, energy storage containers, wind turbine models, substation detail, golden-hour lighting): USD 650 ~ 950 / m²
A 6 m × 4 m solar + storage base at premium lands around USD 18,000 ~ 26,000.
Panel rows are tilted at the design angle (typically 20°–35° depending on latitude), not laid flat.
Row spacing matches the shading calculation on the layout drawing.
Panel surface is dark blue with a subtle cell grid — not a flat blue sheet.
The battery storage containers are white shipping-container-scale units, lined up in the battery room.
The PCS (power conversion system) station, step-up substation and transformer are separate small buildings.
Fire safety equipment and the safety perimeter around the BESS are modeled.
Access roads, the internal fire lane and the perimeter fence are visible.
If the project includes wind turbines, the turbines are scaled to actual hub height and rotor diameter.
The grid connection point and the transmission line corridor are marked.
Board, legend sheet showing row pitch and tilt angle, lighting remote (golden-hour scene is the default), one installation.