A district regulatory plan can run three hundred pages long, and half the people sitting through the review can't read it. Shrink the drawing down to 1:1,000 so every tower, road and green belt actually stands in front of them — executives can walk an entire district in ten minutes. That is the only reason planning models exist. We have been building them for fifteen years. The largest district-level model we delivered ran 12 m × 8 m; the smallest community-scale piece was just 1.8 m × 1.2 m.
The footprint of your model is constrained before it is designed. The three hard limits every client forgets: the width of your showroom door, the elevator car dimensions on delivery day, and road transport width limits. Ignore those and the piece may simply never make it into the room.
表格
| Model Tier | Footprint (L × W) | Typical Venue |
|---|---|---|
| Community scale | 1.5 m × 1.2 m – 2.5 m × 2 m | Sub-district halls, sales gallery area boards |
| District scale | 3 m × 2 m – 6 m × 4 m | Planning exhibition halls, government reception rooms |
| City scale | 8 m × 5 m – 12 m × 8 m | City planning museums, large investment promotion centers |
Anything above 6 m across must ship as a modular podium with assembly seams held under 2 mm. We do a full dry-fit in our workshop before crating — models that are matched for the first time on site almost never line up.
Scale decides whether your buildings can actually carry windows. The workhorse ratios:
1:500 — the default for sub-district and area boards. Buildings get real window cuts and curtain-wall mullions.
1:800 – 1:1,000 — mainstream for district-level shows. Anchor towers glow; secondary plots read as massing blocks.
1:1,500 – 1:2,000 — city master-plan level. Massing and zoning colors only; no façade detail.
Don't ask for 1:200 on a city-wide brief. At 1:200 your footprint balloons to half a basketball court and the towers merge into a dark slab — you learn nothing from it.
Lead time starts the day the approved CAD files land on our floor — not the day we sign the PO. Get that clause into the contract or you will argue about it later.
Community scale (≤ 20 m² footprint): 15 – 20 working days
District scale (20 – 40 m²): 30 – 45 working days
City scale (40 m²+, with multimedia): 60 – 90 working days
Build in one on-site review visit — usually around day 7, once building masses are up. Confirm façade materials and lighting scheme in person. A walk-through saves a week of photo calls.
Planning models are priced by footprint. The acrylic base, lighting, crating, shipping and on-site installation are line items on top. Our 2025 transaction reference:
Economy (laser-cut ABS, flocked greenery, standard LED street points): USD 400 – 650 / m²
Standard (true window cuts, internal LED glows, water feature strips, perimeter wash light): USD 700 – 1,150 / m²
Premium (3D-printed anchor buildings, moving traffic LEDs, projection mapping, touch console): USD 1,300 – 2,200 / m²
Concrete example: a 4 m × 3 m district-level model, standard spec, lands at roughly USD 9,500 – 13,000 door-to-door including crating and installation. If the budget is tight, we simplify secondary roads and background towers — but we never cut the anchor plots, the hero buildings, or the river alignment. Those are the spots executives stare at the longest.
Main bodies are laser-cut ABS engineering board, thickness scaled to the prototype so towers never read as paper-thin.
Curtain-wall façades use 2 mm acrylic over a semi-transparent diffuser, lit internally at 3,000 K warm white — no flat, dead, uniform panels.
Roof parapets, plant decks and entrance canopies are cut as separate pieces. We do not glue a flat slab on top and call it a building.
Roadways come in matte dark grey; pavements in light grey with fine texture. The two greys must read as different from three meters away.
Greenery is layered: model trees from Φ 3 cm upward, mid-level shrubs in tree flocking, lawns in electrostatic turf. A single shade of green across the whole base means the crew skipped a step.
Rivers and ponds are acrylic water sheets over blue LED backing. The surface should read as reflective, not as a slab of blue plastic.
Everything runs on 12 V SELV, transformer hidden inside the podium, exposed terminals insulated.
Lighting is split into at least five independently switched circuits — internal building glow, street lighting, landscape, water, perimeter wash — on a handheld remote.
If your showroom voltage is unstable, order a small line conditioner with us. A single field repair trip costs more than the conditioner itself.
A complete handover includes the model itself, a flight-crated podium, the remote, a spare LED kit, one on-site installation and commissioning visit, and two free maintenance call-outs inside the first year. After year one, service is billed at cost — that is the industry norm. Treat anyone promising "lifetime free maintenance" the way it deserves to be treated.